
Fountom just delivered a shipment of steel plates to Chile in October 2018. All products are subject to LR certification and are finished in 40 days.
Certificate: LR
Delivery time: 40 days against confirmation of drawings and down deposit.
|
Item |
Grade |
TK. (mm) |
Width (mm) |
Length (mm) |
Unit Weight (MT) |
PCS |
Condition of delivery |
Total weight (MT) |
|
|
STEEL PLATES(Shot blasting and shop primer standard sa2.5(2.5), 4 sides of plate should be cut. Paint color: Grey. |
|||||||||
|
01 |
LRA |
6 |
2450 |
12000 |
1.385 |
500 |
AR |
692.500 |
|
|
02 |
LRA |
8 |
2450 |
12000 |
1.846 |
18 |
AR |
33.228 |
|
|
03 |
LRA |
10 |
2450 |
12000 |
2.308 |
6 |
AR |
13.848 |
|
|
04 |
LRA |
12 |
2450 |
12000 |
2.769 |
2 |
AR |
5.538 |
|
|
05 |
LRA |
16 |
2450 |
12000 |
3.693 |
4 |
AR |
14.772 |
|
|
TOTAL: |
530 |
759.886 |
|||||||