8 shipsets composite panels and doors delivered to Chile

With high credibility from clients, Fountom received another 8 ship sets order from clients in Chile. These products include lining, partition, ceiling and door. They will undergo 8 transports.

Item

Product Name

Description of Goods

Qty

(M2 or PC )

LINING

     

01

Lining

JCP-L3, B15, A type, 25mm*Width*L, PVC/G, color F12U

165

02

Lining

JCP-L3, B15, A type, 25mm*Width*L, PVC/G, Wet panel, color F12U

64

PARTITION

     

03

Partition

JCP-B3, B15, A type, 50mm*550*L, PVC/PVC, color F12U

60

04

Partition

JCP-B3, B15, A type, 50mm*550*L, PVC/PVC, Wet panel, color F12U

115

CEILING

     

05

Ceiling

JCP-C6, B0, D type, 25mm*300*L, PAINT/FREE, color 27-4354

135

06

Ceiling

JCP-C6, B0, D type, 25MM*300*L, PAINT/FREE, color CL73A

35

JOINER DOOR

     

07

Joiner Door

CGFM-3, B15, Paint/PVC, Door No.1,6,7,8,12,13,15,16,17 as per drawing, color F12U/FRAME HLDF09

9

08

Joiner Door

CGFM-3, B15, Paint/PVC, Door No.2,3,4,5 as per drawing, color F12U/FRAME HLDF09

4

09

Joiner Door

CGFM-3, B15, Paint/PVC, Door No.9,10,11,14 as per drawing, color F12U/FRAME HLDF09

4

10

Joiner Door

CGFM-3, B15, Paint/PVC, Door No.18,19,21 as per drawing, color F12U/FRAME HLDF09

3

11

Joiner Door

CGFM-3, B15, Paint/PVC, Door No.20 as per drawing, color F12U/FRAME HLDF09

1

12

Inspection door

HLJRT, Paint/PVC, 400*1600, color F12U/FRAME HLDF09

2

13

Inspection door

HLJRT, Paint/PVC, 500*600, color F12U/FRAME HLDF09

1

14

Inspection door

HLJRT, Paint/PVC, 450*700, color F12U/FRAME HLDF09

1

15

Inspection door

HL-TJXM-B, Paint/PVC, 200*200, color27-4354

8

CERTIFICATE

     

16

ABS Certificate

For above panels and doors

1

 

PO date:2018.06.07

Delivery time: 45 days against confirmation of drawings and down deposit.

Shipment date:

1st shipset: 2018.09.26

2nd shipset:2018.11.28

3rd shipset:2019.04.01

4th shipset:2019.06.01

5th shipset:2019.06.01

6th shipset:2019.08.01

7th shipset:2019.08.01

8th shipset:2019.09.01

Project Details
Date
September, 2018